Customers and addresses: measures, due dates and NCC classes
Who this is for: the office person setting up sites in Pump House.
A measure is a fire safety item or feature at a building that must be serviced on a schedule: fire extinguishers, exit and emergency lights, fire doors, hydrants, sprinklers, a pump set. AS1851 is the Australian Standard for the routine servicing of fire protection systems and equipment. It sets out how often each measure is serviced and what each service involves. Pump House has a built-in catalogue of measures based on AS1851, each with its standard service frequency already attached, so you tick what the building has rather than typing it in.
Adding a customer and address
- Open Customers and choose add a customer.
- Enter the customer name and their primary contact details.
- The billing address is optional. Fill it in if the customer needs one.
- Enter the building street address, suburb, state and postcode. The street address is required.
- Choose save customer. The customer profile already shows the building address.
Open that address from the customer profile to add its on-site contacts, NCC classes and measures.
NCC classes in plain words
The NCC (National Construction Code) groups buildings by what they are used for. The form spells each class out next to its number, for example: class 2 is an apartment building, class 3 is long-stay accommodation, class 5 is an office building, class 6 is a shop, class 7a is a carpark, class 9a is a health care building, class 9b is an assembly building, class 9c is residential care. Tick every class that applies: a mixed-use building often has more than one.
Setting up measures
- Open the building's measures tab.
- Tick the measures the building has ("Tick the measures you want scheduled for this building") and attach them.
- Each measure carries a service frequency: monthly, quarterly, six-monthly or annually. The catalogue default follows the standard. You can override the frequency on a measure if this site is contracted differently.
Get the measure list complete at the start. A missing measure is a missing inspection later.
What due and overdue mean
Each measure on a building carries a next due date. The date is set when you attach the measure, and it moves forward by the measure's frequency when an inspection job that covered it is finalised. While a measure is inside its window it shows green. When the due date passes without a completed service, it is overdue: it shows red and appears in the overdue strip on the dashboard. The building's overall compliance status rolls up from its measures.
Still stuck? A person will help.
Email [email protected] and we reply within one business day, Sydney time. You can also use the contact form.
Never include your password. We will never ask for it.
last checked 2026-11-09